Hi,
I have a situation, were the tower is on a very high mountain and all customers are in a very high downtilt angle towards the ap.
The Link Planner allow me to set the max downtilt to -10° for the AP450m. In this situation I have the necessity to calculate a project were the AP450m have an inclination higher than -10° (something like -15°). In real world I can make a selfmade bracket to extend the downtilt but Link Planner doesn't allow me to calculate the real throughupt of 450m in this situation.
How can I solve this?
Thanks
Pierre