PMP 450m Best Practices: Link Test to Multiple LUIDs (Flood Test)

In a Link Test with Multiple LUIDs also known as a Flood Test, all data queues for all Subscriber Modules (SMs) connected to the AP are filled with flood packets. The flood packets are added to the queues in such a way that regular user traffic (non-flood packets) will be sent first. This has the effect of maxing out the link to each SM without affecting user traffic. Note, if specific LUIDs are specified for the test then only the data channels for those LUIDs are filled with flood packets. This quick reference sheet will give you best practices for Link Test to Multiple LUIDs.