What are some of the specifics of collocating AP's and Backhauls?
AP's and Backhauls can be collocated on the same tower observing the following rules:
- 10 AP's and BH modules should be on different bands (i.e. AP?s 5.2GHz, BH 5.7GHz).
- 2) If AP's and BH modules are on the same band, they must be vertically separated by a minimum of 100 feet.
- The exception to this rule would be if an RF shield were employed between the AP's and the BH modules. If the shield as employed, the separation could be reduced.
- 3) All modules must be synchronized on CMM.