Force 300 Field Test

Field testing an ePMP Force 300-25 SM using the Cambium test van. This photo was taken in Busse Woods, across the street from the Rolling Meadows office. The AP was mounted on the mast of our second van, which was located in the Atrium building parking lot. The SMs in this picture are at an elevation of approximately 65 feet! We chose a calm day to avoid the wind from catching the dish and altering the alignment.

3 Likes