Whistle while you work...

Prepping 2, 3, and 4 for the day, more to come. 1 already loaded for a site. Will be posting unboxing and drone footage next week!

1 Like

Those are 450m 3GHz's I assume? What are you using for power and GPS sync with them?

Hi Eric

I can't speak for them but we are using an ICT MPS system with each AP on an individual breaker. Then have a CMM5 at the base of the tower supplying sync via the main port and data via fiber to the SFP2 port.

Took me a while to figure out that SFP1 is disabled for now.

http://www.ict-power.com/products/mps-ultra-dc-power-system/

Eric,

Powering with a Mean Well HLG-600H-54A, and then sync coming from Rack Injector is the plan.