Hardware Scheduling in from version 6.0

Hi all.

I heard some rummours that its possible to run hardware scheduling on software 6.x ?

Is it truth? I thought that its possible only from 7.3.6 + ?

Thanks.

Johnybravo,
That’s going way back. If I remember right only Software Scheduler was available with that release. Are you still running AP’s with software scheduling?

Tom

No no. But thanks for answer. I was just curious. Can’t imagine having 6.x SM talking to 10.5/11.1 AP :-).

Thanks again.